GitHub Project Plan

Purpose

Use GitHub Milestones, Epics, and Issues to plan platform work with clear ownership, scheduling, evidence, and rollback.

Milestones

  • Define a dated delivery checkpoint or platform outcome.
  • Group epics that must be completed together.
  • Carry exit criteria that can be verified from GitHub, manifests, and runtime evidence.

Epics

  • Represent one cross-repo capability slice under a milestone.
  • Link the affected repos, contracts, and operating procedures.
  • Decompose into issues that can be reviewed and rolled back independently.

Issues

  • Represent the smallest reviewable execution unit.
  • Change one coherent behavior, contract, or operational path.
  • Always include acceptance, evidence, and rollback before moving to done.

Priority

  • P0: production blocker, security issue, or same-day delivery requirement.
  • P1: current-week delivery target with direct dependency on active milestone work.
  • P2: planned follow-up work that should land in the next scheduled wave.
  • P3: backlog or optimization work without immediate release pressure.

Week

  • Use YYYY-Www format, for example 2026-W10.
  • Re-evaluate the week whenever dependencies or scope change.

Dependencies

  • List blocking issues, PRs, repos, manifests, or environment gates.
  • Make blockers explicit enough that another engineer can trace them without oral context.

Acceptance

  • Define observable done conditions, not implementation intent.
  • Prefer checks such as manifest diff merged, Argo sync healthy, smoke test pass, or contract updated.

Evidence

  • Attach the proof required to close the item.
  • Typical evidence includes PR links, screenshots, command output, ArgoCD state, and smoke-test results.

Rollback

  • Document the exact revert path before execution starts.
  • Include the repo or manifest to revert and the verification step after rollback.
Milestone Epic Issue Priority Week Dependencies Acceptance Evidence Rollback
Platform routing baseline Shared ingress behavior Add platform redirect middleware to affected app overlay P1 2026-W10 ingress profile update, service PR dev ingress smoke passes and docs updated PR link, sync result, curl output revert PR, resync app, rerun smoke

Operating Rules

  1. Every execution issue should belong to one epic and one milestone.
  2. Priority and week should be reviewed together; stale scheduling is a planning bug.
  3. Acceptance and evidence should be specific enough for async review.
  4. Rollback should be executable by an on-call engineer without extra explanation.