GitHub Project Plan
Purpose
Use GitHub Milestones, Epics, and Issues to plan platform work with clear ownership, scheduling, evidence, and rollback.
Milestones
- Define a dated delivery checkpoint or platform outcome.
- Group epics that must be completed together.
- Carry exit criteria that can be verified from GitHub, manifests, and runtime evidence.
Epics
- Represent one cross-repo capability slice under a milestone.
- Link the affected repos, contracts, and operating procedures.
- Decompose into issues that can be reviewed and rolled back independently.
Issues
- Represent the smallest reviewable execution unit.
- Change one coherent behavior, contract, or operational path.
- Always include acceptance, evidence, and rollback before moving to done.
Priority
P0: production blocker, security issue, or same-day delivery requirement.P1: current-week delivery target with direct dependency on active milestone work.P2: planned follow-up work that should land in the next scheduled wave.P3: backlog or optimization work without immediate release pressure.
Week
- Use
YYYY-Wwwformat, for example2026-W10. - Re-evaluate the week whenever dependencies or scope change.
Dependencies
- List blocking issues, PRs, repos, manifests, or environment gates.
- Make blockers explicit enough that another engineer can trace them without oral context.
Acceptance
- Define observable done conditions, not implementation intent.
- Prefer checks such as manifest diff merged, Argo sync healthy, smoke test pass, or contract updated.
Evidence
- Attach the proof required to close the item.
- Typical evidence includes PR links, screenshots, command output, ArgoCD state, and smoke-test results.
Rollback
- Document the exact revert path before execution starts.
- Include the repo or manifest to revert and the verification step after rollback.
Recommended Planning Table
| Milestone | Epic | Issue | Priority | Week | Dependencies | Acceptance | Evidence | Rollback |
|---|---|---|---|---|---|---|---|---|
| Platform routing baseline | Shared ingress behavior | Add platform redirect middleware to affected app overlay | P1 | 2026-W10 | ingress profile update, service PR | dev ingress smoke passes and docs updated | PR link, sync result, curl output | revert PR, resync app, rerun smoke |
Operating Rules
- Every execution issue should belong to one epic and one milestone.
- Priority and week should be reviewed together; stale scheduling is a planning bug.
- Acceptance and evidence should be specific enough for async review.
- Rollback should be executable by an on-call engineer without extra explanation.